Please register so that we can keep you up to date when we add new content and pictures to the website.
Finally, an update to Ceramicbytes. See what the family did this summer.
Through the long wait to get the pendant lights in. They are now finally installed and we can call our kitchen finished! New items include pendant lights, window shades, and oven installed.
After a long delay we have an update. Notable things include painting the dining room, installing the baseboards and trim, and granite countertops are almost done.
Paint, electrical work, flooring and appliance install.
The kitchen walls are sanded and primed.
The bottom cabinets are installed today. You can really see the layout and flow to the new kitchen design.
After an long update break, we come back with stories of mudding, pipe moving, painting, and cabinet installation.
Day nine of the project brings the first application of mud to the drywall.
Sink venting pipe is complete. Drywall has gone up.
The first phase of the electrical work is done. Drywall is going back up. Counter top decisions close to being done.
The electricians are nearly finished. Pete our contractor is ready to go with drywalling. New lights for the kitchen and dining room are purchased. Floor covering decision has been made and we're closer to picking out counter tops.
Day five was for the electricians. Recessed lighting is installed.
Base wall extended and Gabe's door is framed in.
Day three brought a wall down and a door removed. Some gas line work was done to prepare moving the gas line.
Electrical moved and ceiling prepped for wall removal.
The cabinets have arrived. The contractor has been hired. And now the kitchen remodel has begun. Work has begun!